Research on Risk Correlation of Prefabricated Residential Building Supply Chain based on DEMATEL-ISM Model

Research on Risk Correlation of Prefabricated Residential Building Supply Chain based on DEMATEL-ISM Model

Authors

  • Gaoxian Li Xinjiang University
  • Mingbo He Xinjiang University

DOI:

https://doi.org/10.53469/ijomsr.2023.6(05).09

Abstract

In order to solve the problems of prefabricated residential building supply chain, such as more risk factors, high uncertainty and the influence of risk source factors, DEMATEL-ISM method is proposed to analyze the relationship between risk factors. From the outside, management. Manufacturing and transportation, construction and assembly, delivery six aspects of the establishment of risk index system. Combined with the analysis of examples, it is concluded that the total contract management ability and subcontract management ability are the most fundamental influencing factors of the prefabricated residential building supply chain risk, and have a great impact on other factors. Prefabricated installation precision, transfer layer steel bar positioning, delivery timeliness, quality acceptance are the surface factors of prefabricated residential building supply chain risk, and the impact is small. The research results can provide ideas for the correlation of supply chain risk in related projects.

References

Ji Peng, WU Rongyan, ZHANG Zhiyuan et al. Prefabricated construction development present situation and prospect analysis [J]. Science and technology, the wind, 2022, 492 (16) : 73-75. The DOI: 10.19392 / j.carol carroll nki. 1671-7341.202216024.

XIAO Zhenjiang, Zhang Shengping, Feng Jing et al. Prefabricated construction supply chain information sharing based on the technology of block chain evolutionary game [J]. Journal of civil engineering and management, 2023, 40 (03) : 144-153. The DOI: 10.13579 / j.carol carroll nki. 2095-0985.2023.20220734.

Seth D,Nemani K V,Pokharel S, et al. Impact of competitive conditions on supplier evaluation: a construction supply chain case study[J]. Production Planning & Control,2018,29(3).

Nie J. Sudden Risk Predication Model of Construction Supply Chain Based on Data Mining[J]. International Journal of Industrial and Systems Engineering, 2019,1(1).

Obayi R,Ebrahimi N S. A neo-institutional view of the transaction cost drivers of construction supply chain risk management[J]. Supply Chain Management: An International Journal,2021,26(5).

Tian Z,Guangchen L. A Novel Hybrid Methodology to Study the Risk Management of Prefabricated Building Supply Chains: An Outlook for Sustainability[J]. Sustainability,2022,15(1).

WANG Xiang, Zhou Shiyu, Guo Yibin et al. Research on prefabricated building supply chain Risk based on EFA and CFA [J]. Mathematical Practice and Understanding, 2019,51(12):286-299.

Wang Jianghua, Zhu Xuexin, Song Zhaolong. Integrated risk identification and evaluation of prefabricated building supply chain based on Interface management [J]. Journal of Qingdao University of Technology,20,41(01):41-49.

JU Keyi, Li Hao, Xu Hanwei et al. Research on Influencing factors of user comfort in intelligent buildings based on DEMATEL-ISM [J/OL]. Journal of engineering management: 1-6 [2023-07-19]. DOI: 10.13991 / j.carol carroll nki. Jem. 2023.03.016.

Wang Wenhe, Zhu Zhengxiang, Mi Hongfu et al. Study on Influencing factors of urban underground integrated pipe corridor fire accident based on DEMATEL-ISM [J]. Journal of safety and environment, 2020, 20 (3) : 793-800. The DOI: 10.13637 / j.i SSN. 1009-6094.2019.0092.

Li Xinhua, Li Junhui. Research on Operation safety evaluation method of urban rail transit station based on integration of DEMATEL and ISM [J]. Railway transportation and economy, 2018, 40 (7) : 116-121. The DOI: 10.16668 / j.carol carroll nki. Issn 1003-1421.2018.07.23.

Downloads

Published

2023-10-30
Loading...